Install Mounting Hardware
If you are going to use the lanyards to keep the clevis-2.5in parts attached to the system, bolt them to three of the ring-bushing-universal using the M4x12 flathead screws.
Using 3x M6x80 bolts, install 6x ring-bushing-universal in pairs in any three holes of life-ring-24in. Note the lanyards alternate sides of life-ring-24in. The side with two lanyards will become the "top" of the buoy. Tighten the bolts until the bushings don't spin freely but can still be turned using moderate hand torque.

Last updated